The Challenges
Complex design required using four different wall panel profiles in six colors.
Accurate takeoffs were essential due to materials with long lead times.
On-site coordination ensured proper panel installation per takeoff and shop drawings.
Managing deliveries and inventory to avoid delays and ensure timely installation.